Project scope & drawings
We review the task, drawings and existing infrastructure, then agree requirements and responsibilities.
GTG / FIRE-SAFETY
Smoke-control equipment must respond as part of the building’s fire strategy. We coordinate fans, dampers, control panels and signals with the agreed scenarios and the other engineering disciplines. Interfaces and power arrangements are checked during integrated testing.
Discuss your project
Design · Supply · Installation · Commissioning · Maintenance01 / SCOPE
Smoke extraction and pressurisation within the agreed fire-safety project
Dampers, actuators and fire-mode control panels
Signals, status feedback and power coordination
Scenario testing, fault identification and operating documentation
A coordinated smoke-control system with verified command and feedback sequences for the agreed operating modes.
Developers, residential buildings, hotels, offices, retail and technical facilities. Requirements are assessed for the specific building and project stage.
The final solution, required approvals and handover scope depend on the building and are defined in the project documentation and contract.
GTG / DELIVERY
We review the task, drawings and existing infrastructure, then agree requirements and responsibilities.
Equipment and installation are coordinated with the approved solution and other site contractors.
We check the system and its interfaces, record results and explain operation to the responsible staff.
Maintenance, warranty and response arrangements are defined in the project or service agreement.
Yes. We review the available drawings, specifications and site conditions, then identify what can be used and what needs clarification or revision.
The agreed scope can include design, supply, installation, commissioning and maintenance. The proposal records each stage, dependencies and exclusions.
We first assess condition, equipment suitability and compatibility. We do not accept every existing installation automatically; any corrective work is agreed before service begins.
GTG / NEXT STEP
Send the location, building use, current project stage and any available plans. We will clarify the scope, equipment and interfaces before preparing a proposal.