Global Technology Group
Menu
Discuss a Project

GTG / AUTOMATION

BMS & central monitoring

A large building generates information across many systems. BMS brings agreed equipment states, alarms and measurements into a common operating view. GTG defines the points and interfaces before configuring control logic, displays and access roles.

Discuss your project
BMS & central monitoringDesign · Supply · Installation · Commissioning · Maintenance

01 / SCOPE

What the work includes

  • 01

    System surveys, point schedules and interface coordination

  • 02

    HVAC, water, power and technical-equipment monitoring

  • 03

    Alarm priorities, trends, dashboards and operator permissions

  • 04

    Agreed automation sequences and integrated testing

  • 05

    Operator instruction and configuration documentation

What you receive

A central view of the agreed engineering systems. HVAC and plumbing plant installation is arranged through partners; GTG handles the agreed control and integration scope.

Where it fits

Large buildings and hotels, offices, villas, apartments and smaller commercial properties. Core HVAC and plumbing works can be arranged through partners.

The final solution, required approvals and handover scope depend on the building and are defined in the project documentation and contract.

GTG / DELIVERY

How we deliver

01

Project scope & drawings

We review the task, drawings and existing infrastructure, then agree requirements and responsibilities.

02

Equipment & installation

Equipment and installation are coordinated with the approved solution and other site contractors.

03

Testing & handover

We check the system and its interfaces, record results and explain operation to the responsible staff.

04

Service & upgrades

Maintenance, warranty and response arrangements are defined in the project or service agreement.

GTG / INFORMATION

Before we start

Can you work with an existing project?

Yes. We review the available drawings, specifications and site conditions, then identify what can be used and what needs clarification or revision.

Can you supply a complete installation?

The agreed scope can include design, supply, installation, commissioning and maintenance. The proposal records each stage, dependencies and exclusions.

Can you maintain an existing system?

We first assess condition, equipment suitability and compatibility. We do not accept every existing installation automatically; any corrective work is agreed before service begins.

GTG / NEXT STEP

Start with your building

Send the location, building use, current project stage and any available plans. We will clarify the scope, equipment and interfaces before preparing a proposal.

Discuss your projectprojects@gtg.ge+995 597 70 88 00