Global Technology Group
Menu
Discuss a Project

GTG / ELECTRICAL

Generators, UPS & reserve power

Not every load needs the same continuity of supply. We identify critical equipment with the client and coordinate UPS, generator and transfer arrangements around the agreed operating priorities and duration requirements.

Discuss your project
Generators, UPS & reserve powerDesign · Supply · Installation · Commissioning · Maintenance

01 / SCOPE

What the work includes

  • 01

    Critical-load assessment and reserve-power arrangements

  • 02

    Diesel generators and automatic transfer switching

  • 03

    UPS systems, batteries and dedicated technical spaces

  • 04

    Monitoring interfaces and transfer-scenario checks

  • 05

    Operating instructions and maintenance planning

What you receive

A defined reserve-power scheme with documented priorities, transfer behaviour and maintenance requirements.

Where it fits

New construction, refurbishment, commercial premises, hotels and buildings with critical technical loads.

The final solution, required approvals and handover scope depend on the building and are defined in the project documentation and contract.

GTG / DELIVERY

How we deliver

01

Project scope & drawings

We review the task, drawings and existing infrastructure, then agree requirements and responsibilities.

02

Equipment & installation

Equipment and installation are coordinated with the approved solution and other site contractors.

03

Testing & handover

We check the system and its interfaces, record results and explain operation to the responsible staff.

04

Service & upgrades

Maintenance, warranty and response arrangements are defined in the project or service agreement.

GTG / INFORMATION

Before we start

Can you work with an existing project?

Yes. We review the available drawings, specifications and site conditions, then identify what can be used and what needs clarification or revision.

Can you supply a complete installation?

The agreed scope can include design, supply, installation, commissioning and maintenance. The proposal records each stage, dependencies and exclusions.

Can you maintain an existing system?

We first assess condition, equipment suitability and compatibility. We do not accept every existing installation automatically; any corrective work is agreed before service begins.

GTG / NEXT STEP

Start with your building

Send the location, building use, current project stage and any available plans. We will clarify the scope, equipment and interfaces before preparing a proposal.

Discuss your projectprojects@gtg.ge+995 597 70 88 00